Case Study: Plant Room Upgrade for Swimming Pool Heating

Client: Westbridgeford School

Location: Nottinghamshire

Project: Modernised Plant Room with Boiler Installation

Project Overview

Following the success of our previous works at Westbridgeford School, Anderson Power Generation was proud to return for a second phase of improvement—this time focusing on the plant room supporting the school’s swimming pool facilities. This project was working in collaboration with Northern Pipeworks Services LTD.

The goal: to modernise the plant room and install a more efficient heating system that could meet the demands of daily use while ensuring energy efficiency and reliability.

Scope of Work

Our team carried out a full refurbishment of the plant room, which included:

• The installation of four new high efficiency boilers

• Modifications to existing pipework and controls

• Integration with the swimming pool heating system

• Safety checks and full commissioning

All works were completed on time and to a high standard, with minimal disruption to the school’s operations.

Team Effort & Appreciation

This project showcased the strength and dedication of our installation team, who worked closely with school staff to deliver a seamless upgrade.

“We would like to extend our thanks to everyone involved in the project. The professionalism, attention to detail, and commitment from the team ensured a smooth and successful outcome.” — Josh Anderson, Director

Benefits for the School

Improved Energy Efficiency – the new boilers are more efficient and cost effective

Reliable Temperature Control – ensures the swimming pool remains at a comfortable and consistent temperature

Future Ready System – designed to support the long term heating needs of the facility

Minimal Downtime – careful planning meant the pool was ready for use shortly after completion

At Anderson Power Generation, we take pride in delivering tailored solutions that meet the real world needs of schools and public institutions. We’re pleased to continue supporting Westbridgeford School in their infrastructure development and look forward to future collaborations.

Need support with your plant room or boiler system?

Contact us today: admin@anderson-power.co.uk

Visit: www.anderson-power.co.uk

#CaseStudy #APG #AndersonPowerGeneration #WestbridgefordSchool #PlantRoomUpgrade #BoilerInstallation #SwimmingPoolHeating #AndersonPowerGenerationUK